Pennsylvania DOT — PennDOT Form CS-901

Pennsylvania DOT Traffic-Control Documentation

DTCD generates daily traffic-control documentation that satisfies Pennsylvania's PennDOT Form CS-901 requirement. iOS, Android, and web — built for contractors and utility operators working under Pennsylvania Department of Transportation specifications.

PennDOT Form CS-901 High Confidence Source

The Pennsylvania DOT Requirement

Pennsylvania Department of Transportation contract specifications and construction-manual guidance require traffic-control documentation as a standard contractor deliverable. The naming and form vary by state; the underlying requirement — a date-stamped, contemporaneous record of traffic-control activity — is the same nationwide.

PennDOT Form CS-901 Work Zone Traffic Control Compliance Checklist documents long-term work zone traffic control compliance reviews; Publication 11 says verify CS-901 completed/on file and MPT checked twice daily on major projects. Source: Pennsylvania DOT — primary source ↗

How DTCD applies to this: Work-zone traffic-control compliance checklist/report.

How DTCD Satisfies Pennsylvania's Requirement

Daily Diary Output

One-tap PDF generation produces a date-stamped, GPS-tagged traffic-control diary suitable for submission to Pennsylvania DOT inspectors. Output cites the controlling spec by name on every page.

MUTCD Sign Recognition

AI-assisted MUTCD code identification on every captured photo. Begin-zone, end-zone, taper, and device placement automatically catalogued. Decision-support only — verify all output.

Personnel and Device Logging

Flagger hours, pilot-car hours, connected-device status (arrowboards, PCMS), and per-day deficiency notes — captured in the field, summarized automatically.

WZDx Feed Generation

Real-time WZDx v4.2 / CWZ v1.0 feed publication for any closure. Connected-vehicle platforms, navigation apps, and Pennsylvania's 511 system can ingest the same data your diary cites.

See What DTCD Outputs

The PDF below is a sample DTCD-generated traffic-control diary — the same format your inspector receives, customized to cite the controlling spec for the project's state. Every entry is GPS-tagged, timestamped, and photo-supported.

Sample DTCD output — actual diaries cite your state's specific spec.
Download Sample PDF ↓

Why Pennsylvania Contractors Use DTCD

Pennsylvania contractors face the same documentation burden every day: capture photos, log devices, track personnel hours, generate the diary, file with the inspector. DTCD compresses that burden into a single mobile workflow. The output PDF cites Pennsylvania's PennDOT Form CS-901 requirement by name — so the inspector sees exactly the format they expect, the contractor keeps a complete record, and nothing falls through the cracks.

Built by an Iowa-based SDVOSB. Patent pending.

Other State Coverage

View all 50 states →

See DTCD on your Pennsylvania project

Free trial. iOS, Android, and web. Patent pending.

Open Dashboard Request a Demo