50-State Coverage › Virginia

Virginia traffic control documentation requirements

What Virginia DOT asks a contractor to record about temporary traffic control, where that requirement comes from, and how strong the evidence behind it is.

Citation
Section 105.14 (WZTC Accreditation) + Section 512 (Maintaining Traffic) + project Special Provisions + VDOT LAP Manual Chapter 13
Spec year
2020
Evidence tier
B — binding language identified, pending page-level verification

What Virginia requires

From the specification

VDOT LAP Manual Chapter 13 (verified): "A daily diary of project activities must be kept for all projects and made available for VDOT review on all federal aid projects or projects to be maintained by VDOT."

This is a Locally Administered Projects Manual provision binding on LAP contracts and federal-aid projects. Section 105.14 requires accredited Basic/Intermediate WZTC personnel. Project SP requires TCS to maintain a project work zone TC diary in a bound book with payment consequences when incorporated.

Source: VDOT 2020 Road and Bridge Specifications
How solid is this? Binding language has been identified for Virginia, with page-level verification of the source document still outstanding. Treat the citation as a strong lead rather than a settled quotation, and check it against your contract documents.

How DTCD satisfies it

Daily Entries + PDF Diary Generation produce the "daily diary of project activities" required by VDOT LAP Manual Chapter 13 for federal-aid and VDOT-maintained projects, and the "project work zone traffic control diary in a bound book" required by VDOT Section 512 SP (when incorporated). PDF/A archival-quality export with metadata replaces the bound paper book with a stronger record. Personnel Tracking documents accredited WZTC personnel.

What DTCD adds beyond the requirement

Note: LAP Manual Ch. 13 daily diary applies to federal-aid projects and VDOT-maintained projects (broad scope). Section 512 SP language is project-specific. Daily-doc clause exists at LAP/Federal-aid level even if not in Section 512 itself.

On federal-aid work, 23 CFR 630 Subparts J and K apply whatever Virginia specifies, with a compliance date of December 31, 2026 — the federal floor, explained. And after an incident the questions come from the incident, not the specification: 105 published judicial matters on that.

DTCD produces this record from the drive-through itself, and names the controlling Virginia requirement on the generated PDF. Open a sample before deciding anything.

Try it on one Virginia project See pricing

Filing a work-zone request in Virginia?

Draw the closure on a map and the builder reads the route, mileposts and county from Virginia’s own public GIS, checks bridge clearance on the route and the detour, and exports a WZDx feature, a PDF or an email. It runs in the browser — nothing is submitted or stored.

Open the Virginia builder → · open the offline build · all 50 states

What changes at the Virginia state line

Crews rarely work one state, and the record a neighbouring DOT expects is often named differently and cited somewhere else entirely. Here is how the states bordering Virginia compare:

StateCitationEvidence we have
District of Columbia Traffic-Control DocumentationNot yet verifiedAgency source, medium confidence
KentuckySection 112 (Maintenance and Control of Traffic) + standard Project Note "II. TRAFFIC COORDINATOR"Contract-binding spec language
MarylandSection 104 (Maintenance of Traffic) — PTS daily log + Traffic Barrier daily visual inspection clausesContract-binding spec language
North CarolinaSection 1105-4 (Maintenance and Inspection); Section 1105-5 (Failure to Maintain Traffic Control)Binding language identified
TennesseeNot yet verifiedAgency source, high confidence
West VirginiaNot yet verifiedAgency source, high confidence

All 50 states → · The full 50-state analysis, with every citation →